Another possibility is that, two months after the reactor shut down, the fuel is no longer as "hot" as it would have been otherwise. Hot fission products will have decayed and unspent fuel might not heat up enough to melt or burn the Zircon fuel rods.
If the fuel rods are indeed fully exposed, presumably they have been for long enough that whatever disaster was going to happen has already happened. Economics is politics by other means
Even fully-spent fuel-rods need a lot of cooling, don't they, for quite some time after being withdrawn from the reactor?
The protocol for dealing with spent fuel appears to be to cool it in water for a year in the reactor's own spent-fuel pool, after which it is cool enough to move to on-site storate by human operators.
But this does not necessarily mean that a year is needed for the fuel to cool down enough for the rods not to melt or burn. It means a year is sufficient time (or comfortbly more than sufficient time, given the "defence in depth" philosophy at play here) for the fuel rods to not emit enough gamma radiation to be unsafe to handle by human operators wearing standard protective clothing. Keeping them in water for a whole year may also use the water as a radiation shield (for beta radiation mostly), not necessarily for cooling. Economics is politics by other means
Lets just get the facts straight, using this data that 200GJ of energy is required for a melt through we can then calculate using the formulas provided that the time for melt through is using Po=1380MW 0 minutes after shut down - 4hours 01 hours after shut down - 5 hours 02 days after shut down - 11 hours 30 days after shut down - 26 hours 60 days after shut down - 36 hours
It's pointed out that that is time for fuel melt rather than melt of core through the bottom Any idiot can face a crisis - it's day to day living that wears you out.
Tokyo Electric Power Co., the operator of the crippled Fukushima Daiichi nuclear power plant, revealed Thursday that holes had been created by melted nuclear fuel at the bottom of the No. 1 reactor's pressure vessel. The company said it has found multiple holes adding up to several centimeters in welded piping. Earlier in the day, it said the amount of water inside the troubled reactor was unexpectedly low -- not enough to cover the nuclear fuel -- hinting that a large part of the fuel melted after being fully exposed.
Tokyo Electric Power Co., the operator of the crippled Fukushima Daiichi nuclear power plant, revealed Thursday that holes had been created by melted nuclear fuel at the bottom of the No. 1 reactor's pressure vessel.
The company said it has found multiple holes adding up to several centimeters in welded piping. Earlier in the day, it said the amount of water inside the troubled reactor was unexpectedly low -- not enough to cover the nuclear fuel -- hinting that a large part of the fuel melted after being fully exposed.
Tokyo Electric says temperatures at the bottom of the reactor are between 100 and 120 degrees Celsius, suggesting that the fuel has fallen and is being cooled in the water below. The utility says it does not believe the fuel has completely melted and spilled through the bottom of the reactor. It adds that instead, the fuel appears to be being cooled inside the reactor.
But maybe these are premature conclusions: the new makeshift water level gages might have been unfit for the purpose, too. *Lunatic*, n. One whose delusions are out of fashion.
Matsumoto also said that, considering the situation with the No. 1 reactor, the water level data from reactors 2 and 3 may not be credible.
by Frank Schnittger - May 31
by Oui - May 30 44 comments
by Frank Schnittger - May 23 3 comments
by Frank Schnittger - May 27 3 comments
by Oui - May 13 66 comments
by Oui - Jun 55 comments
by Oui - Jun 253 comments
by Oui - Jun 112 comments
by Oui - May 3179 comments
by Oui - May 3044 comments
by Frank Schnittger - May 273 comments
by Oui - May 2740 comments
by Oui - May 24
by Frank Schnittger - May 233 comments
by Oui - May 1366 comments
by Oui - May 928 comments
by Oui - May 450 comments
by Oui - May 312 comments
by Oui - Apr 30273 comments
by Oui - Apr 2666 comments
by Oui - Apr 8107 comments
by Oui - Mar 19145 comments