No need for math, the answer is easier then that.

Any assessment of the costs of wind power must rely heavily upon assumptions about the
average load factor that will be achieved by new wind installations over their lifetime. It is
standard practice to calculate average load factors by year and country for onshore and offshore
installations as shown in Table 1 (page 40).1 However, such estimates do not provide a
reliable statistical basis for assessing the future performance of wind farms in aggregate. Part
of the reason is that the amount of wind in any month or year is influenced by long term meteorological
cycles that have periods of many years, notably the North Atlantic Oscillation. In
addition, average load factors do not allow for changes in the composition of wind installations
by location, age, size and other factors.

So Table 1 is only included to be used as an example of the standard method that is contrasted against the author's method.

Sweden's finest (and perhaps only) collaborative, leftist e-newspaper Synapze.se

by A swedish kind of death on Sun Dec 23rd, 2012 at 12:05:21 PM EST
[ Parent ]

Others have rated this comment as follows:

JakeS 4

Display:

Occasional Series