Forgot to add: downthread I gave a ministry estimate of 150 GW as the PV potential of Japan on suitable surfaces. I think that cap translates into another istallation speed constraint, but assuming all these surfaces can be filled in three years, we are speaking about a ceiling of 165 TWh a year or c. 15% of consumption.